This article introduces the removal of the DOOSAN DL350 wheel loader hydraulic control device
2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software
a
b
c
Disassembly
1. Figure 78,shows complete control unit.
2. Mark the installation position of different covers,the
housing and the cable harness with the valve housing.
Doosan Diagnostic Tool DDT G2 SCAN( ECU ,DCU)Software 2016
3 Loosen socket head screws.
4. Separate duct plate,1st gasket,intermediate plate and 2nd gasket from the valve housing.
(S)Box spanner (Torx TX-27)-5873042002
5. Remove retaining clip.
6. Loosen socket head screws.
7. Separate cover from housing and cable harness. (S)Box spanner (Torx TX-27)-5873042002
8. Disassemble opposite cover.
9. Disconnect pressure regulator and remove cable hamess
10.Loosen socket head screws,remove fixing plate and pressure regulators (3x).
(S)Box spanner (Torx TX-27)-5873042002
Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality
11. Loosen two socket head screws and locate housing provisionally,using adjusting screws.(Housing is spring loaded).Then loosen remaining socket and screws.
(S)Box spanner (Torx TX -27)-5873042002
(S)Adjusting screws -5870204036
12.Separate housing from valve housing by loosening adjusting screws uniformly.
(S)Adjusting screws -5870204036
13.Remove components(Figure 87).
14. Remove opposite pressure regulators,housing and components accordingly (Figure 88).