Doosan DA30 Dump Truck the ECU Wiring Tier2 -Removal



This article introduces doosan DA30 Dump Truck the ECU wiring Tier2   -Removal

2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software
Drain the coolant from the engine as described in the work de
scriptions for the cooling system.
2. Wash clean the rocker covers and the area
around them.
3. Remove the inlet pipe between the turbocharger and the air
cleaner.

4. Remove the air line to the compressor. The air line is located
on the left-hand cable duct.
5. Unplug the connectors from the control unit.
6. Remove the rocker covers.
On the 12-litre engine the crankcase ventilation must be removed
before the rocker cover on cylinder 1 can be removed.
Doosan Machine Engine Diagnostic Software Package 2024 One PC Installation

7.Disconnect the cables from the unit injectors.
The screws cannot be removed, but they should be unscrewed
as far as possible.
8.Mark the cables with the respective cylinder numbers.
9.Remove the cable duct to which the cables are attached.
The unscrew the cable bushings in the lower rocker covers
and remove the cables.
10.Remove the charge air sensor and its clamps.
11.On engines ftted with an electricallycontrolled fan, separate
the connector on the fan ring, which is connected to the solenoid
valve.Remove the cable clamps as well.
12.Remove the oil pressure sensor and its clamps.
13.Remove the coolant temperature air sensor and its clamps.

Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality